Home button
Site map button
Assessibility logo
Email button
FAQ button
Font Size
Small font
Medium font
Large font
816 969-1900
WaterTabs
HighlightsContact UsConnect With Us...

OUR MISSION

Lee's Summit Water Utilities is dedicated to providing reliable water and sanitary sewer services responsibly and efficiently for the health and safety of our community with exceptional customer service, integrity and pride. 

 

Can't Flush This!

There are so many items that we try to flush down the toilet that really should not be there – medications, wipes, hygiene products, diapers, etc.  Our sanitary sewer systems are not designed for anything other than standard toilet paper and human waste to be flushed. Other items – even those marked “flushable” can clog up a sewer main or lateral before it naturally biodegrades. Overtime, flushing these “foreign” items can result in back-ups or overflows. So before you flush, remember you can’t flush this:

  • Baby wipes
  • Diapers
  • Paper towels
  • Cleaning wipes
  • Cotton balls or swabs
  • Syringes
  • Candy or food wrappers
  • Clothing labels
  • Sponges
  • Toys
  • Any plastic item
  • Aquarium gravel
  • Kitty litter
  • Rubber or latex items
  • Cigarette butts
  • Feminine hygiene products
  • Hair
  • Underwear
  • Disposable toilet brushes
  • Medication
  • Bandages


 

Pay your bill online with Utility Link 

The new secure bill payment system is now available. To register with Utility Link, you will need to have your account number and customer number which can be found on your new bill. Once registered, you will  no longer need your account and customer number to access your account as you can log in with your new username and password. Sign up now.

 

Neighborhood Water Main Replacement Underway: The Strategic Plan in Action

 

The Water Utilities Department is proactively replacing six miles of water main throughout the city in areas most prone to breaks, which result in interruptions in service and increased maintenance costs.

The $3.6 million Neighborhood Water Main Replacement project will replace 33,065 feet of cast iron pipe in neighborhoods throughout the city with new PVC piping that has a life expectancy of more than 75 years.

Prairie Lee Lake Sewer System ready for private connections

 The Prairie Lee Lake Sanitary Sewer System project is drawing to a close and ready for customers to make connections.

The $1 million project was funded in June 2011 to provide residents and property owners along Prairie Lee Lake with access to the City’s sewer system.

Page 7 of 7First   Previous   2  3  4  5  6  [7]  Next   Last